01 THE CHALLENGE

Upgrade two pitches with existing infrastructure

Clonmore GFC required a lighting upgrade for both their main and training pitches. With an existing system partially in place, the challenge was to significantly improve lighting levels and uniformity while incorporating the club’s current infrastructure. The project needed to deliver professional performance, and to be completed with minimal disruption during a busy season.

02 OUR SOLUTION

Hybrid lighting system

To meet the club’s needs, Indigo Sports Solutions designed a hybrid lighting system that combined new and existing technology. Indigo Sports Solutions installed 8 of the high-performance Titan Sports Luminaires on the main pitch and paired them with 8 of the existing fittings to optimise both output and cost efficiency. All other existing luminaires were relocated from the existing setup to upgrade the adjacent training field.

03 THE RESULT

Professional performance with minimal disruption

0
Pitches Upgraded

Main + Training

0
Hybrid System

New Titan + existing luminaires

0
Completion

June 2025

The hybrid approach delivered professional-grade lighting levels and uniformity across both pitches while making full use of the club’s existing infrastructure. The project was completed with minimal disruption during a busy season, giving Clonmore GFC a significantly upgraded facility ready for match play and training.